New construction sod installation in Toronto
The house is finished and the yard is bare. We loosen the ground, set the final grade, spread topsoil and lay the sod.

When the builder leaves and the yard is dirt
A building site ends as packed subsoil. Excavators, concrete trucks and skips have run over it for months, and what topsoil there was has been scraped off or buried. The Toronto and Region Conservation Authority has found that on development sites topsoil is commonly put back over subsoil compacted so hard that roots and rain cannot get through. Sod laid straight onto that has little to root into.
So a new-build installation starts below the surface. We break up the compaction, clear the rubble, shape the final grade and spread fresh topsoil before a single roll goes down. Because there is no old lawn to remove, the job is priced on the bare-ground line, $1.75 – $3.00 per sq ft before HST.
How a new-build installation runs
Sod is the last trade on site. It follows the driveway, the walkways, the fences and any pool, so that nothing drives over it afterwards.
Site check
We look at levels, debris and how a delivery truck gets in.
Loosen and clear
Compacted ground is broken up, and stones, rubble and roots are taken out.
Final grade
The surface is shaped to the levels on your grading plan, so water runs where the plan sends it.
Topsoil and sod
Fresh topsoil is raked smooth and the rolls are laid tight against one another.
Water and hand over
The first soak, then written care instructions.
Grading, drainage and the City's criteria
A new or infill house in Toronto is built to a site-grading plan. The owner's grading consultant prepares it, reviews the work and issues a Lot Grading Certificate to Toronto Building once the final grades are in.
Our work has to match that plan, not redraw it. The points here are the ones in the City's infill grading criteria that touch the lawn. Confirm the figures for your lot with Toronto Building.
Side yards
The criteria call for side yards to drain at surface slopes of not less than 1.5 per cent.
Front yard
The average slope down to the top of the curb should fall between 2 and 6 per cent.
Rear yard
The slope should not exceed 10 per cent, except where existing grades are being left as they are.
Neighbours
No new ponding on adjacent properties, and downspouts are not to be directed onto them.
What changes the price on bare ground
| Factor | Effect on the estimate |
|---|---|
| Area | Whole-lot jobs on new builds are often large enough to reach the lower end of the range. |
| Compaction | Ground that heavy machinery has run over takes more loosening. |
| Debris | Buried rubble, gravel and concrete washout have to come out first. |
| Grade | The closer the builder's rough grade is to the plan, the less shaping is left to do. |
| Access | Finished fences and narrow side yards mean hand work. |
Price line: $1.75 – $3.00 per sq ft before HST. Open areas over 5,000 sq ft: $1.50 – $2.25. A worked example for a new-build back yard is in the cost guide.

Common new-construction jobs
Custom home close-out
Front and back yards finished before the keys change hands.
Whole lotAfter a pool or an addition
The strip the machines tore up, tied into the lawn that survived.
Part yardSeveral lots for one builder
Laid lot by lot as each one reaches final grade.
Multi-lotFront yard after a new driveway
Grass put back as the soft landscaping the zoning by-law requires in a front yard.
Front
What sod cannot do on a new lot
- Fix a grade that drains the wrong way. That has to be corrected before the topsoil.
- Root through hard-packed subsoil. Loosening is not optional.
- Take construction traffic. Finish the heavy work before the lawn goes in.
Where we install sod on new builds
Across the City of Toronto. The North York neighbourhood pages listed here go into the conditions on rebuilt and newly built lots.
- North York
- Etobicoke
- Scarborough
- East York
- York
- Old Toronto
- Willowdale, North York
- Downsview, North York
- Glen Park, North York
New construction sod installation questions
When in the build should the sod go down?
Last. Sod should follow the driveway, walkways, fences, decks and any pool, because none of those can be built without driving or digging across the yard. It also needs the final grade in place. The practical trigger is the day the last machine leaves. Put your target date on the estimate form and we will work back from it.
Can you work from our lot grading plan?
Yes, and we need to. On a new or infill house the grading plan is prepared by the owner's grading consultant, who also certifies the final grades to Toronto Building. We shape the topsoil to the levels on that plan. We do not prepare the plan or issue the certificate. Email the drawing to info@torontosodinstallation.ca, or call (647) 243-4764 to talk it through.
What if the ground is full of rubble?
It comes out before the topsoil goes on. Stones, broken concrete, gravel and buried offcuts are common on a building site, and the City's own specification for laying sod calls for debris and stones over 50 mm to be removed. How much there is affects the price, which is why we look at the site first. Photos of the yard help us judge it before a visit.
Other services: Residential sod installation · Commercial sod installation · Sod installation cost